Home>>Website Design>>Web site building process
Web site building process

First, understand the needs of customers
1. Customer website building basic needs, including:
Company, the website describes the basic functions, the basic design requirements, and other functional requirements;
2. In the shortest possible time on our customer needs to be resumed, the initial talks, the two sides established cooperation intentions.
Second, in formulating the programme website
1. The two sides content on the web site to explore the whole building, detailed, meticulous and complete list of all functional requirements;
2. For our planning, developing construction site preliminary programme;
3. , A review of the initial programme, If there is an objection, the proposed amendments and proposals to amend our side until the two sides reach a consensus, if there was no objection, then that the programme for the final package;
4. Determine "site-building programme" and quotes.
Third, the construction contract signed Site
1. The two sides signed "site-building contract";
2. Customers pay not less than 50% Price web site as a whole advances;
3. Needed for the building site, provide the relevant information content.
Fourth, the draft completed
1. According to "site-building programme" to complete the draft design, including:
(1) Home Style
(2) channel Home Style
(3) the site structure plans
2. On the draft audit clients, If there is an objection, to amend the views of our revised and submitted to the customer reaffirmed;
3. Customers confirm the draft design and signed the "draft website design confirmation."
V. Program Development
1. According to the draft site style, the completion of all page design;
2. Site development background, databases, and other functions, and the prospects of combining pages;
3. Laws, testing procedures and page design, site until the completion of the overall production.
6, the website test
1. Taiwan and the overall test sites;
2. Customers based on "site-building programme" acceptance;
3. Qualified acceptance by the customer sign the "construction site confirmation of the acceptance of the";
4. Customers pay the balance, the Website;
5. Our customers domain names registered, and open space sites, the production upload files, settings, such as e-mail.
7, the use of training site
1. Our customers free of charge on the use of the training site;
2. I submit direction, "Website Maintenance Manual";
3. According to our "site-building contracts" and "web site maintenance manuals" relevant provisions of the client web site maintenance and update.
8, website promotion
1. Preliminary site promotion planning;
2. Depth website promotion planning;
3. Site optimization promotion.
 
 
 
   北京总部    太原分公司    English
北京网站建设 网站建设 北京网站制作 网站制作 北京网站建设 密云网站建设 网站建设 北京网站建设 北京网站制作 北京网站建设 上海网站建设 博网设计北京网站建设 上海网站建设 上海网站建设 深圳网站建设 网站制作 Copyright © 2007 Itqiji.com Inc. All rights reserved. 奇迹网络 版权所有
Tel: +86-10-81832456    +86-10-82410258     +86-010-82416384  
Mob: +86-13161366165                                    
QQ:450338384   23287943                           
Address:NO. 319 Building NO. 1 19 Shangdixinxi Road  District Haidian Peiking China                
Mail:qijiforever#yahoo.com.cn